Chiller Solutions Fluid Solutions On-line Store Affiliates General Services Contact Legacy Chiller Systems
 
 
Knowledge Base Index
 * Legacy Economizer Systems 5 Articles 
 Chiller Capacity Tables 74 Articles 
 Chiller Industry Articles 37 Articles 
 Chiller System Installation 4 Articles 
 Chiller System Maintenance 1 Articles 
 Chiller Systems Design 12 Articles 
 Chiller Training 10 Articles 
 Chiller Training Webinars 5 Articles 
 Chiller Troubleshooting 30 Articles 
 Legacy Customer Interests 7 Articles 
 OEM - Service Bulletins 1 Articles 
Top Ten Articles
Water loop piping system design
Chiller Installation, Startup, and Maintenance
Glycol - Adding to chiller loop
Closed Loop Chiller System - Automatic Air Vents
Chiller Systems Recommended Maintenance
Chiller System Microprocessor Programming
Chiller Problems - Microprocessor Low Pressure error
Chiller Systems - Starting your Chiller
Chiller Systems - Flooded Condenser Valves
Chiller Problems - Microprocessor Low Flow error
My Recently Viewed Articles
Receiver valves closed
Knowledge Base Search
Keywords  
Article Type  
Receiver valves closed

SYMPTOMS
Chiller compressor starts and runs, then shuts off after a few minutes of running. Microprocessor controller indicates Low-pressure safety trip. Refrigeration suction pressure is low and head pressure is low.

CAUSE
In order to meet US Department of Transportation (DOT) requirements during transport, receiver valves on chiller systems equipment with flooded condenser (optional) are shipped in the front seated (closed) position. Should the compressor be started while the receiver valves are in the closed position, a system pump down will occur. Once the compressor suction pressure drops below the LP1 pre-set, the microprocessor will automatically shut down the compressor.

RESOLUTION
Prior to startup, the inlet and outlet valves located on the receiver must be fully back seated – opened. This can be done by:

1. Locating the flooded condenser receiver. This is a vertical black tank component with two valves attached to it. Note: On larger Semi-hermetic compressor system the receiver will be a large horizontal mounted component.

2. Remove the plastic dust caps using the proper size hex wrench.

3. Using the proper sized hex wrench or refrigeration service ratchet, turn the chrome valves stem counter clock wise until the stem is fully back seated.

4. Using the proper size hex wrench, tighten (¼ turn max) the valve packing nut before replacing the plastic dust covers.

5. Using the proper size hex wrench, replace and tighten plastic dust caps. Thread by hand to stop plus ¼ turn with hex wrench.

6. Remove paper tags that may be attached to receiver valves

MORE INFORMATION
Legacy Chiller Systems Installation operations guide booklet shipped with chiller.

APPLIES TO
All chiller models equipped with flooded receivers.

Posted 3/30/2006 :: 485 views
 
Related Articles
Chiller Installation, Startup, and Maintenance

Need instant sales support?

Call our TOLL FREE support line: 1-877-988-5464

OR

Live chat by BoldchatPlus
CRM by Boldcenter

Need a FAST quote??

 

CLICK HERE

To register or login to your Quote Wizard account and save up to 40%


Order your CDKEY catalog TODAY!

Featured Affiliate
UsedChillerStore.com

For both Buyers and Sellers this site offers a NO COST, Effective and Easy alternative to expensive auction sites or resellers who charge commissions. Our goal is to provide sellers an way to expose their used chiller equipment to a vast numbers of qualified buyers while giving buyers the ability to locate the equipment they need as quickly as possible.


Buy/Sell used and new overstock chillers FREE at UsedChillerstore.com

Home | Chiller Solutions | Fluid Solutions | On-line Store | Affiliates | General Support | Contact Us | Site Map | Links
Questions or problems regarding this web site should be directed to support@Legacychillers.com.
Copyright © 2007 Legacy Chiller Systems (USA). All rights reserved.
Toll free within USA/CANADA  - 877-988-5464