Knowledge Base Search

Page   1  of  1

Chiller Installation, Startup, and Maintenance (IOM Booklet)

The attached PDF includes information needed for installation, startup and maintenance of all Legacy Scoll series chillers. All Legacy Products with IDEC (PLC) controls.

Chiller Systems - Restart during winter conditions

Restart of an air cooled condenser during the winter can be a challenge as snow and ice tends to be very opportunistic. During no (or low) load conditions, some basic system...

Chiller Systems - Starting your Chiller

The attached PDF provides copies of factory required startup authorization and startup check list.

NOTE: FAILURE TO PERFORM PROPER STARTUP MAY CAUSE OPERATIONAL DELAYS...

City water changeover / Economizer power open spring closed valves

The attached PDF includes information needed for service of the JCI VA9208 power open spring return values. Legacy Chiller Systems optional auto city water change over panels...

Compressor Warranty

I have a 4 year extended warranty on my Copeland compressor. What are the procedures for warranty return? STANDARD Compressor Coverage: Legacy offers both standard and optional...

IDEC - Control remote chiller and system pump Start Stop

We have provided a PDF download file that describes how to the Idec I4 and I7 dedicated inputs to turn the chillers system pump (I4) or the entire chiller (I7) on and off...

Legacy ChillerGuard - Installation and Setup

Legacy's ChillerGuard remote IP device can be retrofit onto all model chillers shipped after 1-1-2009. For chillers shipped prior to 1-1-09, Legacy offers a retrofit that...

PSG - Control remote chiller and system pump Start Stop

We have provided a PDF download file that describes how to use commonly available parts to remotely start and stop your Legacy Chillers system pump as well as the entire...

Page   1  of  1